Class Hours: 9:40 – 2:05
Mr. Cronin
Notes
- Thursday!
- We are going to have visitor make up day. Maybe the final final visitors to farm.
- Students working with visitors from 9:40 to 10:05:
- eMurray
- Spafford
- gSample
- Bevins
- Schuyler
- Eli
- Finn
- Students working with visitors from 10:35 to 11:05:
- Alex
- Asa
- Remember the visitor workflow:
- Start with the visitor info form first.
- Show off 3 favorite / best projects
- Teach them something, how to DO something, some hands on practice
- Let them see you working on current projects (Pin / Storyboard / Reef)
- Early break / late English due to our visitors.
- Today and Friday around English we will have Skills Production. Don’t forget that we have a deadline of Friday at 12:10 to have assets in your team folder on the public. Mr. Bohmann and I have decided to have both CAWD and CAWD2 present their Skills work to the classes on Monday morning at 10 – make sure to hit your 12:10 Friday deliverable! Mr. Bohmann is creating his CAWD2 class for next year this month, you want to make sure you impress him.
- Today is our first day of English with Mr. Bisson, our sub for Mrs. McCadden for the next 3 weeks or so.
- Bevins – you and I can sit down at 1:20 after break and crack open a brand new box and start our project?
9:40 Attendance
9:45 Thursday / Friday AM SkillsUSA Production
You lost 50 minutes of time for Skills Production due to our snow day. This is life. Adapt. You now have the following time left:
- Thursday around English (90 minutes)
- Friday Around English (90 minutes)
All the deliverables will be on Friday March 4th at 12:10.
Each team will have different work this morning based on your chosen competition:
Create a 720p animation of the Titanic Disaster. You can go for Realism, you can go for a stylistic look and feel, but be consistent with your art style between partners. Lots of people died here, so let’s keep the overall feel fairly serious. (No MLG air horns, or “Hey kid do you want to see a dead body” in the sound design.)
You need to demonstrate at least 4 different camera shots:
- POV shot
- Establishing shot
- Medium shot
- Dutch angle
Include Sound Design. Any sound from the internet is legal to use.
While you can work on this at home, you should realize that the state and national design competitions are around 7 hours. Spending 64 hours over vacation making it “perfect” isn’t going to prepare you for the deadlines and timelines of the actual competition.
So don’t take forever to do the project, but at the same time….
I don’t want to hear excuses of “it’s rendering” or “we didn’t have enough time”. Work efficiently. You will not have enough time to make it the quality level you want. This is life. Hit. The. Deadline.
Share work between partners on the public drive. Communicate effectively. You and your partner need to learn to rely on each other.
Who is going to model what? Who is going to be the lead animator, who is going to be the video editor, who is doing the sound design? You can always rotate through computers if a file is saved here or there.
When complete create a file animation called “titanic.mp4” and place in your team folder – on Friday March 4th by 12:10 for credit.
We are thinking about the software development cycle:
Hopefully we are past planning. We “know” what we want to create. Now we are in steps 2-4.
I want to complete the basic mechanic that you will use in your game. We need to get to a Minimum Viable Product of the game.
A minimum viable product (MVP) is a version of a product with just enough features to be usable by early customers who can then provide feedback for future product development.
– The Internet
We all need to get to an MVP at a minimum to pitch our game to the judges at the SkillsUSA Game Design competition.
So what are you going to “do” in your game?
Take Finn and Jasper’s game so far. Their mechanic is:
Finding keys that unlock doors and let the player move through the level without being killed by creatures.
You and your partner need to:
- Decide what the main mechanic is for your game. What are you going to “do”?
- Decide what has to be created and coded at the very least so when you pitch your game, you can demonstrate functionality.
- Do it. Use the web to research how. Follow online guidance, a tutorial, the program documentation.
I don’t care if you are living in a non-textured basic cube world, if the main mechanic for the game works, you are approaching the MVP of your game.
First – the work. Program and create the art needed for your core mechanic. The main game functionality. Don’t worry about the fluff (beautiful worlds, lighting, textures, sound, menus, everything extra).
Second – the output. Use OBS to demonstrate the core mechanic for your game. Use Premiere to create titles or use voice over to describe what the mechanic is. We want to see it in action, and we want to hear or read about it. While you play your game, explain what you are doing, and how it is the core mechanic of your game. For full credit we need to see the completed mechanic.
For Finn and Jasper’s game it would be:
- Door is locked.
- Finds a key that goes to the locked door.
- Door opens.
- Get to end of level – all while avoiding enemies.
Finn and Jasper will demonstrate the 4 steps above through OBS, explain it with titles, or narrate in a voice over.
When complete create a file animation called “mvp.mp4” and place in your team folder – on Friday March 4th by 12:10 for credit.
Create a web page that has a gallery of 12 thumbnail images. These thumbnail images can be small versions of the full sized, or portions of the full sized. All thumbnail images must be the same size.
Setup gallery using flex so they can be equally distributed, and the gallery looks attractive.
Setup functionality so what when we click on the image we load a full sized image. The full sized images do not need to be the same size. How do I create a link? Figure it out.
Once you get the gallery working, I want you to setup Lightbox working with it. How? Figure it out.
Use the following image to create your color palette from Adobe Color:
In the end you will have a web page that:
- Uses flex to display a gallery of thumbnails.
- Uses links to load full size images.
- Incorporates a lightbox style effect.
- Is valid html.
- Uses a color palette built from an image.
Place your completed project in your team folder by on Friday March 4th by 12:10 for credit. This will include your html, images and folder, style document and folder, and other assets (js?) as required.
10:10 Morning Break (10 minutes)
- 10 Minutes break – you have to exit the room.
- When the door near the TV is open, you are welcome to come back in.
10:20 Thursday / Friday AM SkillsUSA Production
11:05 English
11:55 Thursday / Friday AM SkillsUSA Production
12:15 Lunch (30 Minutes)
- No food in the room / eat in the Cafe.
- You are welcome to return to the room when you have finished eating and work / hang out.
12:45 Attendance and Article
12:50 Mindfullness and Databases
1:10 Afternoon Break (10 minutes)
- 10 Minutes break – you have to exit the room.
- When the door near the TV is open, you are welcome to come back in.
1:20 Afternoon Production
- Week 25 Agency
- “(lastName)Agency_1.jpg” through “(lastName)Agency_3.jpg”
- … or …
- “(lastName)Agency.mp4
- “(lastName)Agency_1.jpg” through “(lastName)Agency_3.jpg”
… or work on Skills Production.